A new driveway costs $4,800 to $18,000 for a typical 600 sq ft (roughly 12×50 ft) driveway in 2026, depending on material. Gravel is cheapest, pavers cost the most, and concrete and asphalt sit in the middle with very different maintenance profiles.
Concrete is the most-quoted driveway material, so here's its full breakdown. Other materials follow the same structure — the surface line changes, the prep work doesn't.
| Cost item | What's included | Low end | High end |
|---|---|---|---|
| Old driveway tear-out & disposal | Breaking up and hauling away the existing surface (skip if new construction) | $0 | $2,000 |
| Grading & gravel base | Excavation, 4–8 inches of compacted stone base, leveling | $900 | $2,200 |
| Concrete & reinforcement | 4-inch slab, 3,500–4,000 PSI mix, rebar or wire mesh, forms | $2,400 | $4,200 |
| Pouring & finishing labor | Placement, screeding, broom or smooth finish, control joints | $1,500 | $3,200 |
| Apron & permit work | Street apron/curb cut where required, municipal permit and inspection | $300 | $1,500 |
| Sealing (recommended) | Penetrating sealer after curing, especially in freeze-thaw climates | $0 | $600 |
| Total (600 sq ft concrete) | 2026 national estimate | $5,100 | $13,700 |
2026 national estimates for planning. Stamped or colored concrete adds $3–$8 per sq ft. A thicker 5–6 inch slab for heavy vehicles adds roughly 15–25%.
| Material | Lifespan & upkeep | Typical low | Typical high |
|---|---|---|---|
| Gravel | Long-lasting with re-grading; top up stone every few years | $1,800 | $4,500 |
| Asphalt | 20–30 years; sealcoat every 3–5 years ($300–$700) | $4,200 | $7,200 |
| Concrete | 30–40+ years; minimal upkeep, seal in salt country | $4,800 | $8,400 |
| Stamped concrete | Same slab, decorative finish; reseal every 2–3 years | $7,200 | $13,200 |
| Pavers | 30–50 years; individual units replaceable, premium look | $8,400 | $15,000 |
| Tar-and-chip | 10–15 years; rustic look, low cost per foot | $3,000 | $6,000 |
DIY: Gravel driveways are genuinely DIY-friendly — rent a skid steer, lay landscape fabric, spread and compact stone in lifts. Some handy homeowners also lay pavers on small areas, though the base prep is heavy, exacting work. Expect to save 40–60% on gravel or paver labor if your time is free.
Hire a pro for: concrete and asphalt. Both are unforgiving materials with a short working window, and the finish quality is entirely about crew experience. A bad pour can't be patched into a good one. Always verify the quote specifies slab thickness, base depth and PSI — that's where corner-cutters hide their margin.
Four inches over a compacted stone base is the residential standard for cars and light trucks. Go 5–6 inches if heavy trucks, RVs or delivery vehicles use it regularly.
Asphalt costs less up front and handles freeze-thaw flexing well, but needs sealcoating and lasts 20–30 years. Concrete costs more, lasts 30–40+ years, and needs little maintenance. In hot climates concrete wins clearly; in the North it's a closer call.
Concrete: typically 7 days for cars (full cure is ~28 days). Asphalt: 3–5 days in warm weather, longer in heat waves. Pavers and gravel: usually right away once compacted.
Often yes — especially if you're widening it, changing the apron, or affecting drainage. Rules are municipal; a reputable contractor will know and pull the permit as part of the job.
Long or steep driveways, heavy tear-out, drainage work, retaining edges and premium finishes all push past the typical range. Ask the contractor to itemize — the breakdown table above shows what a transparent quote should separate.